3-Dimensional PMOptimizationSM
Equipment Reliability Analysis
- Initial Optimization
PM Tasks are reviewed, rationalized and optimized to:
• Understand logical basis behind existing PM
• Determine which PM tasks add no value
• Determine the right/best task
• Find best way to execute right task
• Assign appropriate task typemore... - PM Task Pass / Fail Analysis
After the Initial Optimization, PM tasks remain optimized through continuous feedback of PM results found during PM execution, tracked at a failure mode level.more... - Equipment Reliability Analysis
PMs are continuously optimized via feedback from other equipment performance tracking systems beyond the PM system such as:
• Computer Maintenance Management System
• Downtime Tracking System
• Overall Equipment Effectiveness Tracking
• PLC Fault Trackingmore... 
Reliability Fusion is the software hub that provides automation for all three dimensions of LAI's 3-Dimensional PMOptimizationSM process.more...
Net Gains:
- Reduce PM Labor Hours by 40%
- Reduce Scheduled Downtime by 35%
- Increase PM Coverage by 50%
3rd Dimension: Equipment Reliability Analysis | 1st Dimension | 2nd Dimension
Continuous feedback on equipment reliability from other equipment performance tracking systems beyond the PM System:
- CMMS (Computerized Maintenance Management System)
- Downtime Tracking System
- OEE (Overall Equipment Effectiveness) Tracking
- PLC Fault Tracking on critical systems, etc.
Benefits:
- PM Tasks are continuously optimized.
- The feedback loop from other information systems results in improvements to the process.
- Because PM Tasks are optimized and performance is evaluated at a failure mode level, much more accurate data is available for calculating Performance Metrics or KPI's (Key Performance Indicators).