3-Dimensional PMOptimizationSM
Initial Optimization
- Initial Optimization
PM Tasks are reviewed, rationalized and optimized to:
• Understand logical basis behind existing PM
• Determine which PM tasks add no value
• Determine the right/best task
• Find best way to execute right task
• Assign appropriate task typemore... - PM Task Pass / Fail Analysis
After the Initial Optimization, PM tasks remain optimized through continuous feedback of PM results found during PM execution, tracked at a failure mode level.more... - Equipment Reliability Analysis
PMs are continuously optimized via feedback from other equipment performance tracking systems beyond the PM system such as:
• Computer Maintenance Management System
• Downtime Tracking System
• Overall Equipment Effectiveness Tracking
• PLC Fault Trackingmore... 
Reliability Fusion is the software hub that provides automation for all three dimensions of LAI's 3-Dimensional PMOptimizationSM process.more...
Net Gains:
- Reduce PM Labor Hours by 40%
- Reduce Scheduled Downtime by 35%
- Increase PM Coverage by 50%
1st Dimension: Initial Optimization | 2nd Dimension | 3rd Dimension
"It's like running your current PMs through a series of 14 individual efficiency optimization opportunity filters."
PM Tasks are reviewed, rationalized and optimized.
Benefits:
- Understand the rationale behind the existing PM
- Determine which PM tasks do not add value, and which ones can be eliminated with minimal effort
- It is estimated that 30% of the PM tasks often add no value!
- It has also been proven that an even greater percentage can increase the chance of failure!
- Determine the right task, the best task
- Classify PM tasks as one of 4 types and then apply a process of task promotion
- Find the best way to execute the right task
- Who?
- When?
- With what?
- During which conditions?
- Assign the type of task that will protect the flow of work through the Maintenance process
- The right PM task will not only protect reliability, but it will protect the flow of work through the Maintenance process!
- Utilize an innovative process that expedites the determination of likely failure modes
- PM Tasks can be evaluated at a failure mode level!
"It is the right task, performed by the right skill, at the right interval & at minimal cost."


Learn more...