As a special free offer, LAI would like to share a case study with you showing just how powerful PM Optimization can be as a tool for reducing your costs, reducing scheduled downtime and showing how you can free up labor to maximize your throughput.
In this case study, the result of LAI’s PM Optimization process on a single machine yielded 41% reduction in Labor, $1134 in annual parts savings, 72% reduction in Scheduled Downtime and 36% increase in PM Coverage compared to the original PM data. The Optimized PM was then easily applied to the remaining 24 machines at the site and the corporation is now working on applying the exercise globally.
LAI Reliability Systems, Inc.
PM Optimization Case Study*
*To activate the Download Link, first fill out the form below and click on "Activate PMO Case Study Link," then click on the document link.